Mandatory Benefits: 2010 ASU Benefits Open Enrollment

This project is to initiate the enrollment process for the 2010 calendar year Flexible Spending Accounts and additional Life Insurance choices.

January 5, 2010
HRIS Process Flow Documentation

Develop a method to document the OHR flow of jobs and queries that are processed during the two-week pay period, quarterly, fiscal year end and as needed. The ‘process flow document’ will be a detailed, written documentation of processes, queries and procedures for the payroll, benefit, talent acquisition, financial services and human resources modules. Each step of the process will be properly documented and available to each HR module. The list will include process names, navigation, job names, run control instructions, job dependencies, days to run the process, and on-call procedures. Also included are on-call instructions for each process should specific problems arise (i.e. rerun, send email, or call supervisor, etc.).

The Support Team will initiate the original list and will meet with functional users and production support to review the biweekly document to add, revise or delete processes.

The documentation will be used as a communication tool in coordinating process changes with Operations. In addition, the document will be used as a testing tool during updates and fixes.

The consequences of not having written documentation causes lost work, frustration and inconsistencies in addition of having disastrous consequences.

November 30, 2009
Graduate Academic Advising - Orphan POS and Milestone Delete PeopleSoft Mod

Develop and implemnent a PeopleSoft mod that enables a restricted group of staff in the Graduate College to re-attach an orphaned POS based on new keys assigned to student program/plan stack. This mod will also allow staff to delete extraneous milestones that are attached to a POS and no longer needed.

November 11, 2009
Graduate Legacy Gportal and GCRegistration Apps - Move to Tomcat Servers

Migrate two legacy Java apps from WebSphere 5 to Tomcat server farm. The WebSphere 5 software is no longer supported by IBM or UTO and these apps need to be moved to Tomcat in the short term until they can be retired in entirety.

November 10, 2009
Graduation Automation v1.5

This version will get us closer to automating graduation and limiting manual intervention. In this version we need to update how we are handling students with more than one Program (Career in PeopleSoft). Review and update Good/Bad Graduation Report for Graduation Automation. Use the current PeopleSoft Application Engine but with updates to handle the various records. Process will include running a report for all applied graduates, running DARS audits for these students, then updating the students records in PeopleSoft based on business requirements.

November 4, 2009
CLAS : Politics & Global Studies

Build the new School of Politics and Global Studies website.

 

Comps are complete, navigation etc are being worked on .

8/1 - redesign complete - handed over to CLAS to finish up navigation and content

November 2, 2009
Upgrade ADOA's operating system that is hosting Advantage

ADOA's IBM mainframe, that is hosting ASU's Advantage system, is running an outdated operating system version. This system needs to be upgraded from V1.4 to V1.9 to bring us in compliance with IBM support requirements. This upgrade will also result in a reduction in ASU costs to ADOA for their hosting services.

October 31, 2009
ERE (Employer Related Expenditures) Flat Rate Proposal

This project will change the Employer Related Expenditures calculated by Payroll from an actual basis to a flat rate basis. We currently interface the actual rate (PS delivered/calculated as part of the regular payroll processing) to Advantage and this will continue without changes. The new calculation will also be interfaced to advantage.

October 30, 2009
LeRoy Eyring Center: Automation of Recharge Systems

Create a web application that allows ASU students and external users the ability to schedule use time on LeRoy Eyring Center for Solid State Science instruments. Create an administrative site for LeRoy Eyring Center site admins to add/edit/delete users, equipment, transactions and accounts.

October 28, 2009
Web Service for Sun Card Photo Access

The photos taken for SunCards for students/faculty/staff are now availalbe in an Oracle database for uses within the university. The first two identified uses are the My ASU Faculty roster interface and the WP Carey Advisor web application. A web service would facilitate the ease of adding additional uses to this new system. It would create secure access to the data for internal university web applications.

October 16, 2009
CLAS : School of Historical, Philosophical & Religious Studies Website

Build new School of Historical, Philosophical and Religious Studies website. Landing portal for departments:

 

  • history
  • philosophy
  • religious studies

 

Status

  •  7/2 comps completed
  • 7/30 Implementation complete - Working with Roxane Barwick to finalize before going to prod.

October 2, 2009
My ASU - Graduation tab

Update My Programs and eAdvisor (Undergrad) and My Programs and Degree Progress (Grad) boxes in My ASU with graduation application progress information. As the students status changes display different information and links.

October 2, 2009
Graduate Web App - SAM and Letter of Recommendation Integration

Integrate the Graduate Admissions Web Application with the Supplemental Application Manager (SAM) in PeopleSoft. The project also includes integration into the Letter of Recommendation interface so that a customized set of questions can be tailored to each academic plan code.

October 1, 2009
Financial Audit: Payroll Process and Reporting Improvements

This project will update three payroll reports and provide additional HRIS page restrictions to ensure more accurate payroll processing. The three reports included in this project are ASUPY034 - PreSheet, PAY035 - PreCalc, and PAY036 - PreConfirm. Updating the reports will streamline payroll processing.

In addition, adding the auto assigning of on-line check numbering and graying out the direct deposit button will benefit payroll processing.

September 30, 2009
Dashboard - Course Enrollment Management V.1.4

This project will focus on enhancing the data available in the Course Capacity page of the Course Enrollment Management dashboard to facilitate forecasting and management of course enrollment.

Update: 9/29/2009 - The final changes migrated to production on Friday, September 25, 2009.

The project timeline must be rebaselined since a milestone of getting new fields in the table in the EPM has not been met before the critical processing freeze.

September 30, 2009
CLAS : School of Social Transformation

Build new School of Social Transformation website. This will be portal site to departments under the school.

 

Finalized comp:

 

**Update - 9/22/200

This website has been completed with some minor updates to be made.  Final product will be released 9/28/2009.

September 30, 2009
Blackboard version nine pilot

Pilot the latest release of Blackboard application with a small group of instructors to determine best next steps for institution wide implementation of this Blackboard upgrade.

September 15, 2009
Datacenter Enhancements "Geographic Diversity" Version 1.0

The UTO Operations System & Security group at Arizona State University (ASU) has shown a need for geographical diversity in the placement of the Datacenter complex Firewalls. In order to provide the requested Geographical diversity, Hot Standby Router Protocol (HSRP) will need to be extended to the ISTB1 Data Center. Extending HSRP across the ECA, ECB and ISTB1 data centers will create a more flexible and diverse network within datacenter complex. Once the network is geographically diverse, the firewall clusters can be moved to diverse locations

September 12, 2009
Fiscal Year 2010 Notice of Appointments

The intent of this project is to enable an employee to easily accept their Notice of Appointment electronically and recieve confirmation, along with a pdf document for their records.

ASU would like to use the NOA as a place holder for information on renewals and non renewals for year-to-year employees. The university would like to begin sending the NOA in advance of the next Fiscal and Academic years. 

The Notice of Appointment is subject to the Conditions of Professional Service (ABOR 6-301), as modified by the Board Resolution dated March 13, 2009, Conditions of Service Professional Service (SPP 320), the Arizona Board of Regents Intellectual Property policy (ABOR 6-908), and Code of Conduct policy (ABOR 5-301 et seq.), copies of which will be made available upon request. Due to the policy changes, all affected employees will require a written notice of the change. This response will be captured by accepting their FY2010 NOA.

The Notices will be available for acceptance in two phases. Phase 1: Service Professional and Administrative Appointments, including Faculty with Administrative Appointments and Academic Professionals with Administrative Appointments will be available for acceptance from 6/1/2009 to 6/29/2009. Phase 2: Academic Appointments and Tenured data Faculty will be available from 8/17/2009 to 8/31/2009.

September 8, 2009
Control-D Project

The scope of this project is to create the infrastructure to enable the migration of Control-D reports and repository from the mainframe Control-D to a Control-D distributed system.

 

September 4, 2009
Enterprise JIRA

Implement a production enterprise JIRA environment for UTO development. UTO developers have been using ALT^I's JIRA site to define, organize, prioritize development tasks, assign development resources, identify target due dates, etc. Although using ALT^I's application has worked to this point, access was granted based on UTO developers being former ALT^I developers. This access then extended to most UTO developers, business analysts and project managers using JIRA/Confluence. ALT^I's JIRA application was purchased with grant money for specific needs.

UTO would like to standardize on JIRA for development task tracking. Having an enterprise system will also allow UTO to extend access to JIRA to other ASU development areas that we partner with. An additional benefit to have an enterprise JIRA environment is the control of administrative permissions. With the ALT^I JIRA site administrative requests to add users, change permissions, create new project space, etc. all had to go through an ALT^I JIRA administrator.

September 4, 2009
Add CAPTCHA Challenge to ASU Weblogin SSO

The AZ State Auditor General has mandated that ASU's Weblogin Single Sign-On, and PeopleSoft back office login be modified to include an account lock-out on N failed password attempts. The industry best-practice suggestion is a CAPTCHA challenge to stop "bots" from repeatedly attempting to hack an account.  

This project will include two iterations.  The first will enable a captcha challenge with Webauth, and provide a standard lockout mechanism to PeopleSoft Back Office System with a manual unlock process with the Help Desk.  The second iteration will enable webauth login for PeopleSoft Back Office Systems.

This project will also hand-over development of ASU's SSO customizations from the UTO Operations Systems group to the UTO Web Development group (Wilken).

September 4, 2009
eAdvisor: Advisor Tracking Tool for Engineering College

Implement a solution to allow prerequisite course work to be completed by Engineering critical tracking students. The students should not be off track for starting Math requirments at a prerequisite level.

September 3, 2009
eAdvisor: Plan Extensions Data v3.1

Add additonal data to PeopleSoft plan extensions to allow smooth operations of the Degree Search web application. The added data will store campus data for minors, customized messages for majors that are no longer accepting applications and display who was the last user to update the data.

September 3, 2009
Fault Tolerant Internet Version 1.0 "Geographic Diversity"

This project will provide geographically diverse hardware for a more fault tolerant Internet border on the ASU enterprise IP network.

September 1, 2009
OVPGE Studioabroad Implementation/Deployment (Studio Abroad)

Work with 3rd party to deploy the Studioaborad software.

 

  •  OVPGE will be paying for servers & manpower 
  • Need to address maintenence.

Exploratory phase - waiting for more details.

 

Requirements:

  • ColdFusion Server (through Jack)

 

4/21 - PO for server and coldfusion received from OVPGE - OPS group to start setting up.

4/27 - Kickoff meeting with OVPGE

 

8/20 update

SSO Integration - unknown status

LDAP - Code should work, Nathan G needs to connect to Oracle DB just in case it doesnt work.

Nathan G. to help transition skinning of site over to provost group.

Adrian T, Jere Coon working with Dan Hart to put together data integration process from PS/EPM

Data Integration Process

Integration process:

  1. Export data from Peoplesoft/EPM to flat CSV file (Initial tests - ok, don't see an issue)
  2. Import CSV file to intermediate database table (TBD - need to locate suitable area for this)
  3. Configure studioabroad to read import data from intermediate database table

Data Integration COMPLETE, TESTED OK (8/28 - AT)

Outstanding - need to work on daily batch process for data import.

 SSO Integration

  •  SSO Integration in progress
  • Terradotta code to compare hashes returned by SSO app to verify login status.
  • Terradotta code does not hash correctly.
  • Nate Wilken's group overseeing SSO.
September 1, 2009
ASU on Facebook v2.0

ASU would like to continue working with Inigral to bring additional security and usability enhancements to the existing ASU Facebook Application. In the early stages of this project research this list of improvements will be identified and added to the scope of this project page.

September 1, 2009
Benefit Processing Verification/Synchronization with External Vendors

This project encompass three benefit enhancements: Benefits Reporting, Retirement Manager for 403(b) and ADOA/ASU compare synchronization.

August 31, 2009
Position Management Lockout for MSS

Manager Self Service has the ability to process Position Management changes on a 24/7 timeframe. Some of these changes are impacting Payroll and Financial Services during a course of several days of processing payroll and distribution of payroll.

August 31, 2009
eAdvisor: Prerequisite Review/Drop of Classes V2.0

In Version 1.0 a process was created to review student enrollment and drop students from pre-requisite classes they no longer met the requirement for. Version 2.0 of the project includes additional criteria such as milestones, GPA, plan requirements which students will be screen on. The audience is all undergraduate students for Fall 09. The project will be operationalized so that in future semesters UTO Operations will be responsible for the process.

August 13, 2009
Graduation Automation v1.0

This is Phase on of this new process. Review and update Good/Bad Graduation Report for Graduation Automation. Use delivered PeopleSoft batch process to update students records with "good" degree checkout status. Process will include running a report for all applied graduates, running DARS audits for these students, then updating the students records in PeopleSoft.

August 12, 2009
My ASU - Faculty/Staff Redesign

This project will implement a redesign the Faculty/Staff page of My ASU.

** 8.5 UPDATE **
Golive moved out one day (from 8.6 to 8.7)- need to complete Help box/CRM functionality

August 7, 2009
2009 ADOA Open Enrollment

The Arizona Department of Administration (ADOA) holds Open Enrollment annually for medical, dental, vision, supplemental life and short-term disability benefits. ASU has been advised that this year's Open Enrollment will run Aug 10-31 for an effective date of Oct 1, 2009. The system will need to be updated for new rates, new plans may be offered and vendors may change. In addition, Benefits would like the ability to generate a confirmation of benefits elected at time of submission.

August 7, 2009
Dashboard- Open Enrollment Benefit Tracking (August 2009)

Build an Open Enrollment Benefit Tracking dashboard for the Business Operations Managers (BOMS) and senior leadership to track those completing on-line benefit enrollment and those who haven't. ADOA is changing health plan and there is a not a "default" option, which makes tracking critical. Open Enrollment will be from August 10 to August 31, 2009.

August 7, 2009
eAdvisor: Degree Search v3.0 (Performance Improvement)

The purpose of Degree Search 3.0 is to improve the performance speed of the web application.

August 5, 2009
Graduate Admissions Change Form Version 1.0

Develop and implement a self service function for admitted, or enrolled student to request a change to their plan, campus, term. Application will entail payment of fees by credit card via Nelnet.

August 3, 2009
Faculty Productivity v3.0 - Automate Grade Transfer from Blackboard to PeopleSoft

This project will create a way for instructors who track and record their final grades in Blackboard to easily transfer them from Blackboard to PeopleSoft. This will automate the transfer of grades and will reduce the number of steps currently required by the manual grade import process.

Completed and in production as of Friday, July 31.

August 3, 2009
CLAS : Drupalize Natural History Collection Site

Drupalize the natural history collection site    

Implement ASU/CLAS template Branding

Move http://nhc.asu.edu into Drupal. Will host it on collections.asu.edu - 129.219.110.117 

August 1, 2009
Graduate Application move to Nelnet

Modify the graduate admissions application to use Nelnet instead of CyberSource

July 31, 2009
CLAS : Research Apprenticeship Program Website

Build CLAS ResearchApprenticeship Program website

 

  • Professors to be able to post apprenticeship postings
  • Students to be able to search and apply for programs 

Phase 1  - Website Build (completed)

7/2 - Completed website build

Phase2 - Improvements/Bug Fixes (ongoing)

7/24 - Improve search functionality.

7/27 - Complete

July 30, 2009
Effort Reporting - Gross Pay View / Over-the Cap Calculation

The gross pay on an Effort Report needs to display all pay details behind the pay amount.

Over-the-Cap limits can be adjusted every year and the system needs to accommodate this change. Will have an impact on spring effort reports due to new caps applicable in 2009. Need to update system for new salary cap for 2009 periods, while not affecting reports for 2008 periods.

CRM Case 323995

July 24, 2009
SSO for AZTE

AZTE (Arizona Technology Enterprises) operates as the exclusive intellectual property management and technology transfer organization for ASU through the ASU Foundation. The organization assists researchers and faculty at the university to evaluate, patent, market, license, and protect Intellectual Property.

To this end AZTE has purchased a hosted web application by the company Inteum. This application assists in the managment of intellectual asset management for researchers and faculty.

Single Sign On is key for this application to go live and make access seamless.

This project is strategic for OVPREA and the ASU Foundation.

July 24, 2009
My ASU - Housing

This version will implement the My Community block with the following content: Housing. The Housing tab will be the first tab in the new My Community box on My ASU. The application will walk First-Time Freshmen through the Housing process, from choosing housing and dining options, confirming or modifying their housing and dining choices, requesting an exemption, and viewing move in details. Targeted messaging will be displayed to the student depending on where they are in the process.

** 7.9 UPDATE **
Code has been deployed to PROD - waiting for customer OK to enable for users; patch scheduled to be migrated on 7.10 includes minor UI changes

** 7.15 UPDATE **
Functionality is available in PROD - will need to migrate final patch (UI changes) early next week

July 21, 2009
CLAS OAP Application

To redevelop the CLAS Office of Academic Programs application in .NET according to CLAS’s Office of Academic Programs current needs. The previous application that existed in MS Access is outdated and not pulling the needed data sources.

July 17, 2009
Financial System - 2009 Year End Close

There are a number of jobs to be scheduled for year end financial close as well as some changes in Risk management rates and transaction numbers.

July 17, 2009
Audit Recommendations for Fiscal Year 2008 Audit

While the Attorney General's Office was conducting the 2008 Fiscal Year audit a compilation of items was being tracked. These items identified an owner, description and completion date. Each of these tasks were either considered a Deficiency that was Rectified or a Recommendation that was Implemented.

July 15, 2009
Dashboard: Research Activity Version 2.0

The Research Dashboard helps users to make business decisions using research information. As amended, this version requires far fewer effort hours from UTO, and still offers a significant and popular addition, the "Cross-section" chart.

Click here to view the case in PeopleSoft: CRM Case #376282

July 10, 2009
Residential Life - ISAAC interface version 1.0

This project is to automate the assignment and residential data within the ISAAC (Door Access) system.  The automation of this environment will include imports from PeopleSoft, Sun Card information, and Residential life data.  The assignment into rooms will be automated releasing the Reslife staff from reassigning manually.  The automation is designed off the business rules for the Residential life office.

 This automation will make future automation for other areas possible with little impact and development.

July 6, 2009
Administrative Reorganization FY2010

This project has been renamed, used to be VP/College Code Synchronization.
As reorganizations dictate changes be made to VP/College Codes and Department Codes, the synchronization between the two have become disconnected. This has resulted in, for example, departments to display on dashboards unassociated with a VP area. This project will address both the immediate need to re-synchronize as well as establish a means to ensure code changes are managed consistently and remain synchronized. The changes include creating/updating departments, security tree and row level security, position, job data and funding. Coordinating the changes with all involved is critical to timing.

July 1, 2009
ASU Desk Phone Reduction - Proof of Concept UTO: Phase 1

8-17-2009 This project is being closed out, as the original list of deliverables has been met. Resolution of 911 issues is required for phase II of this project.

A Proof of Concept is being tested and implemented at the ASU University Technology Office (UTO). 

ASU has the opportunity to realize significant savings by reducing the number of desk telephones that are now used across all ASU campuses. 

The desk phone reduction options include:

  • Remove the ASU desk phone and eliminate the monthly expense of $33.00
  • ASU provides a Soft Phone for the employee at no cost - this is software that uses the computer as a phone
  • ASU provides a cell phone for the employee and pays all expenses
  • Employee uses their personal cell phone and ASU reimburses for business usage
  • Employee uses their personal cell phone and absorbs cost

UTO will be working together with ASU Colleges/Departments in determining where desk phones are currently utilized and potential savings.  The ASU Colleges/Departments will make the decisions regarding replacement of desk phones and which options will be implemented.

To participate in this opportunity, please contact Rebecca Newton at Rebecca.Newton@asu.edu or (480) 965-2010 . 

July 1, 2009
My ASU v 3.0 - Student Page Redesign

This version of My ASU will implement a layout redesign of the Student page, creating a flexible infrastructure so that new features can be added quickly.

** 6.10 UPDATE **
Golive successful - team is working on a patch to be released on 6.15.

** 6.25 UPDATE **
Additional college box enhancements and an enhancement for Grad College will be released on 7.1.

July 1, 2009
Mainframe Hosting for Advantage at ADOA (Arizona Dept of Administration)

The Advantage financial application is the last remaining mainframe application supported and hosted by UTO (University Technology Office). The goal of this project is to significantly reduce the costs associated with maintaining this application.

ADOA (Arizona Department of Administration) can host this application at their data center located in Phoenix, AZ.  By doing this, the costs for maintaining this application can be reduced by at least 35%.

ASU users will access Advantage via SSL-VPN.

June 30, 2009
Role-Based Access Control Automation - Version 1

The administration of users and access rights within ASU is a complex and challenging task. Role-based access control (RBAC) is a powerful concept for simplifying access control. In particular, Enterprise Roles spanning across different IT systems are increasingly used as a basis for ASU security management. However, the administration of roles in ASU's environment can become quite cumbersome and needs to be automated. ASU currently utilizes manual rule administration. 

This project will identify rules that will be used to support automation of user and access rights administration. This will utilize a new method known as role-based provisioning which combines the advantages of rules and roles.

June 30, 2009
ASU Parking & Transit Services: Migration from PowerPark to the T2 Flex System

ASU Parking & Transit Services is planning to replace the current Parking application with FLEX from T2. This migration would bring richer and better features that expands the service Parking and Transit Services provide across all the Arizona State University campuses.

June 8, 2009
eAdvisor: End of Semester Processing (Spring 2009)

Identify and complete the processes needed to:

1. Report final on/off track status for the Spring 2009 semester
2. Report critical tracking students which are twice off track and need to change majors
3. Remove students which have completed track term 4 and are no longer evaluated as part of critical tracking

June 8, 2009
Dashboard - Faculty V.1.0

Provosts and Deans face countless decisions relating to the University’s faculty staff. Unfortunately the data and information needed to make informed decisions isn’t always readily available as the University’s data is not centrally located or easily retrieved.

The FACULTY DASHBOARD is a tool that brings together data from multiple sources, displays the timeliest and most pertinent information for faculty members, provides ad hoc reports for the recurring analysis of faculty members’ contributions to the University’s colleges and departments, and ultimately provides actionable options to the user so they can implement the decisions they make.


Latest Update:

The dashboard was released to selected individuals in the Provosts' office on Monday June 8th, 2009

June 5, 2009
Blackboard (LMS) – Upgrade to Service Pack 5

Blackboard has recommended that we upgrade to Service Pack 5 to resolve issues experienced by instructors and students.
These include:
• Firefox 3 – “Enter a valid file” error
• Moderated Discussion Board – Error when publishing a moderated post.
• Last name of “Null” – will no longer be a problem.
The Service Pack also provides enhancements and places ASU in an improved position for product support. Upon completion of this upgrade our Blackboard system will be at 8.0.442.0. This upgrade will require an outage scheduled during the break between spring and summer terms to avoid conflicts with instruction. We are currently at Service Pack 3. Service pack 5 includes Service Pack 4.

May 23, 2009
Blackboard (LMS) – Wimba Maintenance

Wimba has recommended that we apply a maintenance patch 3.3.1 to Wimba Voice version 5.3.1 to resolve issues experienced by instructors and students when navigating the product. Wimba Voice is a web-based voice solution that facilitates and promotes vocal instruction, collaboration, coaching, and assessment. Wimba Voice is a feature integrated with Blackboard that allows synchronous participation in chat and presentation. The new patch level also provides enhanced capabilities for those with visual impairment. This upgrade will not require an outage and will be scheduled to avoid conflicts with instruction periods.

May 21, 2009
Installed Product data migration - Fulton School of Engineering

Import inventory records into PeopleSoft Installed Product component tables for Fulton School of Engineering.

May 8, 2009
TMA Systems - Computerized Maintenance Management Systems

TMA Systems is a provider of Computerized Maintenance Management Systems (CMMS). This solution is currently being used at ASU Polytechnic Campus, as well as the Downtown Phoenix Campus. This project has been proposed to create an enterprise level system housed at the UTO.

May 4, 2009
Nelnet black box

The Nelnet black box will replace CyberSource as credit card processing confirmation for 2 pilot applications.

  1. Undergraduate Admissions Application
  2. Graduate Admissions Application
May 4, 2009
CORDA Centerview 3 Upgrade

The Corda Centerview upgrade project would replace the current version 2.0 Corda installation with version 3.0. Version 3.0 would provide fixes and enhancements such as AJAX & browser back button compatibility.

Note: Reinstallation of Corda Centerview 3.1.2, this also has to be installed on Citrix as well as on the webapp servers.

Current Status: Corda Centerview 3.1.2 has been installed in Citrix. However, we need a database set up for webapp to use. Testing has to take place.

Click here to view the case in PeopleSoft: CRM Case #309136

April 30, 2009
Enhanced ASU Internet Border Security - Version 2.0 - DHCP NAT

To this point, all installation work related to the DHCP NAT project was completed on schedule.  The project had been waiting for the completion of the Bio-Design Cisco firewall implementation.  Bio-Design has put that project on hold.  We will proceeding with DHCP NAT implementation at Bio-Design. 

==================================================================================================================== 

Version 2.0: The work will begin by implementing a NAT translation pool at the ASU border to the Internet for the new buildings summer 2008.

The scope will include all four ASU Campuses:  Tempe, West, Poly, Downtown.

 

April 22, 2009
IronPort Email Security Appliance

IronPort Email Security Appliance - Proof of concept.
Evaluation of the solution to assist in further thwarting of security issues with mail, along with reducing infrastructure of baracuda and sendmail by utilizing one systems. Also to evaluate vendors statement of capabilities.
Appliance will be tested to see if it will meet the needs of ASU's email environment.

April 3, 2009
Cisco MARS (Monitoring, Analysis, Response System) Version 1.0

Cisco Security Monitoring, Analysis, and Response System (MARS) provides security monitoring for network devices and host applications supporting both Cisco and other vendors. Security monitoring with MARS greatly reduces false positives by providing an end-to-end topological view of the network, which helps improve threat identification, mitigation responses, and compliance.

This project is an initial deployment into the ASU network.  From this project a larger deployment that encompasses the entire university will be designed for future deployment.

The capability of this appliance is to correlate a number of security logs from the ASU network, servers, and possibly personal computers.  The initial deployment for the system is in the UTO Data Center. 

Other features and benefits of Cisco Security MARS:

  • "Learns" the topology, configuration and behavior of the environment
  • Automatically updates knowledge of new Cisco IPS signatures, for up to the minute reporting on the environment
  • Promotes awareness of environmental anomalies with network behavior analysis using NetFlow and syslog
  • Provides simple access to audit compliance reports
  • Makes precise recommendations for threat mitigation, including the ability to visualize the attack path and identify the source of the threat with detailed topological graphs that simplify security response at Layer 2 and Layer 3
  • Integrates with the Cisco Security Manager to correlate security events with the configured firewall rules and intrusion prevention system (IPS) signatures that can affect the security event.
April 1, 2009
Payroll Process Improvements - 1st QTR 2009

This is part of the payroll continuous improvement effort. The 1st Quarter 2009 activities will be defined in November/December 2008. The focus this quarter is on efficiencies in the payroll process and all of the processes that feed into payroll.

March 31, 2009
Biodesign Cisco Firewall Implementation

This project will install a pair of Cisco 5520 ASA firewalls in the BioDesign buildings to replace the functionality of the current Checkpoint firewalls.

March 25, 2009
Decommission announce.asu.edu v1.0

To decommission announce.asu.edu by deleting unused announcement groups and moving the announcement groups that use this service to another communication method. The announcement groups that are still in use are "Museums and Galleries", "OASIS", and the Netcomm groups "Outtage Notifications". The "Museums and Galleries" and "OASIS" announcement groups will be moved to a listserv. The Netcomm Group's planned outtage notifications will be moving to the system health where users can view the notifications at syshealth.asu.edu. The Netcomm Group's unplanned outtages will be moving to a service provided by e2campus where users can subscribe and be informed via text message, email, and rss. The project relies on the scope of another project, ASU Text Message Notification System since this project is handling the technical set up of the e2campus service.

March 24, 2009
Dashboard - Graduate Admissions V 1.0

This dashboard is the second in a series of dashboards that visualize and report admissions’ data. The Undergraduate Admissions dashboard’s popularity attracted the attention of the Graduate College and they requested a similar tool be built for their data.

The GRADUATE ADMISSINS DASHBOARD is a tool that visualizes the admissions process starting at recruitment and continuing on to applications and finally admits.


Latest Update:
We missed the original Go Live date by about 3 weeks but on 03/23/09 the dashboard went live. The most recent changes were made and an EDNA request was made to open up access to the Staff in the next few days.

We are now shifting resources to be able to address usability requests, data changes and such.



March 23, 2009
Dashboard - UG Admissions (Evaluators) V.1.3

This version of the Undergraduate Admissions dashboard will have several additional features. The main new feature involves a tracking tool for admissions evaluators. It allows them to manually review student's that are not automatically admitted. It includes deep links to Peoplesoft.

Click here to view the case in PeopleSoft: CRM Case #339800

March 15, 2009
ASU Challenges

The ASU Challenges project consists of the development and depolyment of a new brand identity for ASU, creation and unveiling of a galvanizing concept to demonstrate ASU’s vision of a New American University to the community and the nation, and development of a sustaining marketing plan to support the concept long-term.

For more project details see 100project.asu.edu

March 3, 2009
BITKOO Strategic Alliance

Part One:

Implement a commercial identity management system to enhance the functionality EDNA in order to provide a long term sustainable identity management infrustructure to IDEAL and the university. Ideal will be the pilot for development and the governance model (processes, procedures, policies, standards of identity management).

 Part Two:

Part two of the Bitkoo/Keystone project will begin with a kick-off
meeting with all ASU IT professionals affected by the project. The
meeting will introduce the three parts of the project - business,
administration, and development.

Bitkoo DL: Please contact mfontes@asu.edu to be added to the Bitkoo DL.

February 28, 2009
Blackboard (LMS) - Implement Respondus Lock-Down Browser

Install Respondus Lockdown Browser building block in Blackboard. This is a tool for on-line quizzes. It provides an option for instructors to address academic integrity concerns. Respondus LockDown Browser is a custom browser that locks down the testing environment within Blackboard. Students are locked into the assessment and are unable to print, copy, go to another URL, or access other applications until the test is completed.  The instructor uses the building block to select “Restricted Browsing” on a test to requiring the student use the Lockdown browser. When the student attempts to take the test, the student will be required to install the browser the first time. 

 

 The client download can be hosted with Respondus or locally. The plan is to just use the Respondus links because with that we will always have the latest version available and we won’t have to re-create their install decision tree (Mac or PC, etc.). E-mail support for this product is available from Respondus for instructors and students.

February 13, 2009
Change Management System

A Change Management system that encompasses internal processes to improve communication, notification, and approval of changes.  It also in the window for UTC and the TAG representatives into the changes that are occuring or that are in need of comment.

January 30, 2009
Security Awareness (Get Protected) v1.5

Continuation of the information security awareness and training initiative in order to meet regulatory and compliance issues. The project team will be creating a new marketing theme for Spring 09 and update getprotected.asu.edu accordingly. The project will also include updates to the Blackboard training, web content, and print materials as well as diseminate pieces of asu.edu/getprotected to more visited areas of the ASU web.

January 26, 2009
Tri-University Vulnerability Management Tools: Qualys Implementation

A tri-university project was initiated by the University of Arizona for scanning tools that the three universities could collaboration on.  An RFP was issued in July 2008.  The vendor Qualys was selected for the network auditing and vulnerability scanning solution.

January 23, 2009
Dashboard - Sponsored Research V.1.2

The Research Dashboard helps users to make business decisions using research information.

January 21, 2009
Network Access Streamlining/Simplification - Computing Commons & Public Areas

Migrating the common computing images from static to DHCP addresses and moving from private addresses to behind the Cisco Clean Access.

January 16, 2009
Enterprise SharePoint

SharePoint has a lot of traction within the ASU environment for collaboration, basic work-flow, and project management.  The current SharePoint environment needs to address a few items to make it more supportable and dynamic.

This project is to sure up, design and document delegation roles.

January 9, 2009
Provide Geographically diverse site for NetApp storage.

This project will provide off site storage capabilities for the ASU Enterprise NetApp storage network. By utilizing a 1 GB link on the GeoMax network between Tempe and ASUW, UTO will be able to provide a geographically diverse site for backup storage of critical data.

January 8, 2009
DNS Server Software Security Upgrade

Modify current DNS infrastructure to mitigate a cache poisoning security vulunablility of Bind 8.

January 7, 2009
Faculty Activity Report (FAR) V.2


What is the Faculty Activity Report?
The Faculty Activity Report (FAR) is an online tool used to track the accomplishments of ASU faculty for evaluation and informational purposes.

What is being done in FAR Version 2?
The product that is currently in production at the site http://far.asu.edu is powered by a 3rd party provider. Far Version 2 will not be powered by a 3rd party provider in preparation for the 2009 evaluation cycle. Version 2 will include only services and capabilities available prior to 2008. 

Why are you moving away from the 3rd party provider?
The UTO met with several colleges to find out what changes ASU could make to increase the usability of FAR to our customers.  Nearly every meeting resulted in a single fact: ASU faculty found the older version more usable than the tool deployed for the 2008 cycle.

Who are you talking with over the course of this project?
We are speaking with a number of college representatives, Deans, Chairs, and faculty who have expressed interest in the success of this product.  We formed a focus group dedicated to the successful deployment of a product that can be expanded in future revisions tomeet the needs of their groups.

What can I expect during this migration?
There will be a data entry freeze as of December 19th, 2008 at 5:00 PM, which will be in effect until the replacement application is launched on January 5th, 2009.  This new application will include the data that was entered for prior years, and the respective evaluations.  Your data will be read only once the freeze is in place, but not editable.

What is this Uncategorized Data? 

As part of the project to move from Digital Measures FAR (DM) back to our original FAR system, we are converting data from DM back into our original system.  Since the data fields from Digital Measures do not always map cleanly to the fields in the replacement system (the FAR available prior to 2008), we've had to make some assumptions for the location of some data.  With the help of several faculty and staff from the many colleges, we're confident that these assumptions will be correct.  In some cases, there will be no logical place to move DM data.  In these cases this uncategorized data is being migrated and stored in a location where faculty who have entered the data into DM can still access it to copy and paste it into the appropriate FAR fields.

What are the plans for FAR and the Directory?

With the short amount of time provided to bring this application back, there are some "post production" tasks that the UTO will be completing in the first quarter of 2009.  The ASU Directory will be among those tasks.  The directory will include any information provided prior to the freeze, but that information will not be updated with new FAR information until the 3rd week in February. 

Where was my data migrated to?

 

  1. Personal Contact Information and Profile Information will no longer be entered into FAR, but will be made available through the Uncategorized Data pages to copy and paste into the Directory.
  2. Education will also no longer be entered into FAR, but will be made available through the Uncategorized Data pages should you wish to copy and paste them into Directory.
  3. Book Sections have been migrated to Book Chapters
  4. Books Reviewed have been migrated to Books Reviewed
  5. Books Authored have been migrated to Books Authored
  6. Invited Commentaries have been migrated to Commentaries
  7. Community Service has been migrated to Community Service
  8. Conference Proceedings has been migrated to Conference Proceedings
  9. Performing Art has been migrated to Creative Activities
  10. Play writes have been migrated to Creative Activities
  11. Visual Art has been migrated to Creative Activites
  12. Encyclopedia Articles have been migrated to Encyclopedia Articles
  13. Patents have been migrated to Patents
  14. Awards and Honors will be migrated to Honors
  15. Law Review Articles will be entered into Law Review Articles
  16. Mentoring will be migrated into Mentoring
  17. Professional Service have been migrated to Professional service
  18. Abstracts have been migrated to either Refereed or Non Refereed Articles as they were noted in the record
  19. Journal Articles have been migrated to either Refereed or Non Refereed Articles as they were noted in the record
  20. Magazine Articles have been migrated to either Refereed or Non Refereed Articles as they were noted in the record
  21. Newspaper Articles have been migrated to either Refereed or Non Refereed Articles as they were noted in the record
  22. Technical and Research Reports have been migrated to either Refereed or Non Refereed Articles as they were noted in the record
  23. Monetary Awards have been migrated to Service Monetary Awards
  24. Short Stories and Poetry have been migrated to Short Stories/Poetry/Novels/and Creative Non-Fiction
  25. Special Issues have been migrated to Special Issues
  26. Collaborative Activities have been migrated to Collaborative Activities
  27. Presentations have been migrated to Scholarly Conference Presentations/Exhibitions/Colloquia 
  28. University Service has been migrated to University Service
As we stated above, in some cases there was no logical place for the record to be migrated to.  In these cases the records are being displayed in the Uncategorized Data pages so that the faculty might migrate the data to the appropriate places.  The following Digital Measures categories were not migrated to a category in FAR, and are being stored in the Uncategorized Data pages.
  1. Broadcast Media
  2. Creative Writing
  3. Education
  4. Government Publications
  5. Instructors Manuals
  6. Interviews
  7. Licensures and Certifications
  8. Manuscripts
  9. Measurement Instruments
  10. Media Art
  11. New Course Materials
  12. Newsletters
  13. Non-Credit Instruction
  14. Notification of Consulting
  15. Pamphlets
  16. Positions Held
  17. Professional Development
  18. Professional Memberships
  19. Published Projects
  20. Research in Progress
  21. Software
  22. Study Guides
  23. Web Publications
  24. Websites
  25. Works in Progress
  26. Working Papers

 

Who can I contact to find out more information on FAR?
For support or access to the current system,  please email far@asu.edu.  Please include your full name, your ASURITE UserID, and your college or department name.

For more information on the FAR 2.0 project or future revisions, please email the FAR Project Manager, Noel Lindner, at noel@asu.edu.

 

JANUARY 5TH UPDATE - 

Technical difficulties have prevented the deployment of the new web interface for FAR.  The application will launch on January 7th, 2009.  

 

February 27th Update - 

The completion of the Directory updates has been delayed by 2 weeks.  This update is due to be released the week of March  8th, 2009.

 

March 11th Update - 

The remaining tasks, including Directory and My Profile functinality have been been rescheduled due to resource and time constraints. Please note these changes in the Project Schedule and Milestones.

 

April 10th Update - 

Development tasks have been completed, but the web services for the data links between FAR and My profile/Directory are delayed by 1.5 weeks.  These will be available by April  21st.

 

January 5, 2009
Blackboard (LMS) upgrade of Safe Assign

ASU upgraded to Blackboard 8 for Fall 2008.  Current production issues with how a building block to Blackboard, Safe Assign functions will be addressed by a product upgrade.  Current version 1.1.2, new version is 1.2.15.

One common error is the function of the documents with extensions from Office 2007.

January 2, 2009
Blackboard TurningPoint Building Block Installation

The purpose of this project is to install the TurningPoint Blackboard Building Block in Production.

TurningPoint is a Student Response System that allows students to answer questions during lecture time using handheld Response Pads. The TurningPoint Building Block for Blackboard allows students to register their Response Pad ID with the class roster, and allows instructors to download the roster complete with student Response Pad IDs for use with the local TurningPoint software. UTO will pilot a program this Spring 2009 to implement use of the TurningPoint system at West and Poly (and one class at Tempe) with an anticipated University-wide implementation for Fall 2009.

January 2, 2009
Annual SSN Use Review

Review of SSN use, search methods and data view in PS, EDNA, reports (delivered/query access) and interfaces.
Click here to view the case in PeopleSoft: CRM Case #330192 and
CRM Case #315114

January 1, 2009
Hosting evaluation

This project will get a group together and evaluate options for PeopleSoft operations. We have 4 months to gather information outlining the effort, costs and application support infrastructure, etc.

This project is completed with the deliverable being information provided to the project sponsors on hosting options. This information will be used in a subsequent project if and when hosting partners change.

December 5, 2008
Dashboard - Course Enrollment Management including Forecasts V.1.2

This dashboard will follow methodology used by the Provost to calculate enrollment the colleges pay to teach. Drilling will be enabled to at least the department level. Previously, this dashboard was also known as Enrollment Planning and Funding.

Click here to view the case in PeopleSoft: CRM Case #319249

December 1, 2008
Shibboleth: Federated Identity Management - Proof of Concept

Shibboleth is an initiative by Internet2 member universities to develop and deploy new middleware technologies that can facilitate inter-institutional collaboration and access to digital content.

November 30, 2008
eCustoms Payment Screening Application (Tri-University): Phase 1 - ASU Implementation

Arizona Tri-Universities will be implementing a restricted party screening system for payments and business processes.

Version 1 - Focused on the setup of the eCustoms application server at ASU (Arizona State University) and the processing of files from ASU.

Version 2 - Focus on processing files sent from NAU (Northern Arizona University) to the eCustoms application server at ASU. 

Version 3 - Focus on processing files sent from U of A (University of Arizona) to the eCustoms application server at ASU.

The Visual Compliance software solutions system performs Restricted Party Screening against all relevant U.S. Government lists, including Specially Designated Nationals and Blocked Persons (SDN), under (among others):

  • Department of Treasury Office of Foreign Assets Control (OFAC) Sanctions
  • Department of Commerce Bureau of Industry and Security (BIS) Denied Persons List
  • Department of Commerce BIS Entity List and Unverified List
  • Department of State Arms Export Control Act Debarred Parties
  • Department of State Designated Terrorist Organizations
  • Department of State Nonproliferation Orders

Note:  Enhancements were requested for the output of the email notification.  The vendor is working with UTO to provide these enhancements.  The application is currently running in production.  A manual process is in place to provide the additional information while working on the automated solution.   Expected completion date is January 30, 2009.

November 30, 2008
WISE Enterprise Software Packaging

Installation of the WISE enterprise software packaging tool. This tool is used to package software for the Common Computing Image as well as the Citrix application farm.

November 7, 2008
HRHD 120 Day Improvement Plan

To improve the customer experience when calling ASU Human Resources by reducing wait times on the phone and resolving more calls at tier one. Reduce warm transfer times and HR cases to be resolved within the SLA agreement. Set reachable and sustainable service levels supported by defined metrics.

October 10, 2008
UTO Org Chart

To correct current issues with UTO Org chart and to enhance functionality and ensure all employee information is accurate and consistent.

August 25, 2008